dc.contributor.author |
Haque, Tandra |
|
dc.contributor.author |
Saha, Sukhen |
|
dc.date.accessioned |
2023-05-14T06:03:35Z |
|
dc.date.available |
2023-05-14T06:03:35Z |
|
dc.date.issued |
2010-12-24 |
|
dc.identifier.uri |
http://dspace.ewubd.edu:8080/handle/123456789/3986 |
|
dc.description |
This internship submitted in partial fulfillment of the requirements for the degree of B.Sc in Electrical and Electronic Engineering of East West University, Dhaka, Bangladesh. |
en_US |
dc.description.abstract |
The 'internship report is the outcome of the 2-week attachment leaning with Energypac from 21 August to 04 September 2010- The intensive attachment gave us a practical exposure to look at the procedures of the different departments of Energypac. what our respected teachers - in the class that we observed and examined practically, at Energypack during the tenure of attachment. No doubt the duration was short but rt was compact wrth tasks We had to look many things in short period' The intemship report is the manifestation of our practical leaning at Energypac. It has enriched our knowledge with regard to the different branches of electrical and electronic engineering. |
en_US |
dc.language.iso |
en_US |
en_US |
dc.publisher |
East West University |
en_US |
dc.relation.ispartofseries |
;EEE00038 |
|
dc.subject |
Energypac Manufacturing Process of Substational Equipment |
en_US |
dc.title |
Report on Manufacturing Process of Substational Equipment |
en_US |
dc.type |
Thesis |
en_US |