Thesis 2012: Recent submissions

  • Dewan, Sk. Moinul Haque; Al-Masud, Md. Nuruddin; Alam, Md. Iftakhar (East West University, 12/1/2012)
    In order to fulfill the partial requirements of B.Sc in EEE, we have chosen the Industrial attachment or internship. We have done our internship at Ashuganj Power Station Company Ltd (APSCL). Our major area is Power. So ...
  • Khan, Md.Rafiuzzaman (East West University, 2/17/2012)
    Electricity is a fundamental requirement, to upgrade the socio economic condition and to alleviate poverty. Proper and enough electricity supply have a great positive impact on our national economy as well as on GDP of ...
  • Chy, Muhammad Asif Iqbal; Rahman, Md. Lutfar; Rahman, Asifur (East West University, 1/11/2012)
    A shortage of electric energy is the biggest problem to the economical growth of any country. The power sector of Bangladesh faced various problems such as: lack of supply capacity, frequent power cuts, unacceptable ...
  • Andrews, Christer; Kakon, Jannatul Ferdous (East West University, 8/1/2012)
    A wireless adhoc network is a new archetype in wireless communication which doesn‟t require any fixed infrastructure such as base stations or mobile switching centre. Reducing interference is one of the main challenges in ...
  • Khondoker, Fazle Rabbi; Bhuiyan, Tauhid Anwar; Momen, Humam Jahanzeb (East West University, 9/15/2012)
    We did our internship at Siddhirganj EGCB Power Plant, located on the bank of the river Shitalakha, within the Siddhirganj Power Station premises at Siddhirganj, Narayanganj from 12th of August to the 8th of September. ...
  • Khan, Fahmida Repa; Afroz, Fahima (East West University, 9/1/2012)
    The UMTS (Universal mobile telecom system) represents 3rd generation (3G) standard for cellular system. It is based on the existing Global system for mobile (GSM) communication core network (CN) but opted for a totally new ...
  • Islam, Md. Saiful; Chowdhury, Md. Mushfiqul Arefin (East West University, 1/21/2012)
    To fulfill the requirements to be a B.Sc. Engineer from East West University, we have chosen Industrial training (EEE-499). We did our internship at Dhaka Palli Bidyut Samity-01(DPBS-01) at Savar, Dhaka. Our internship ...
  • Hossain, Md. Iqbal (East West University, 1/11/2012)
    I did my internship at Ashuganj Power Station Company Ltd (APSCL) located on the left bank of the river Meghna from 26th of Dcember to 11th of January and this internship report is the result of those 15 days attachment ...