  • Mannan, Zubaer Ibna; Islam, Md. Atikul; Hossain, Md. Shamiun (East West University, 2010-08-03)
    To increasing demand on power by silicon operating at higher frequencies, voltage droops in buses at switching transients can b e a critical constraint. On-die decoupling i s used to the droops and achieve higher ...
  • Ahamed, Tanvir; Uddin, Md. Reaz; Rahman, Md. Mustafezur (East West University, 2010-08-03)
    The PIFA antenna is one of the most widely used antennas in cell phone It is compact in size consumes low power radiates high power. One of the major advantage of a PIF A antenna is that it can be designed for multiband ...
  • Subbir, Jobair Hasan; Tabassum, Noushin (East West University, 2010-12-24)
    Distributed control systems (DCS) are employed in complex process control systems for monitoring, supervision, setpoint control and direct equipment control. In this project we concentrate on direct equipment control ...
  • Islam, Muhammad Rakibul; Hossain, Syed Atique (East West University, 2010-04-22)
    The goal of this thesis is to determine the effects that the actual physical structure of a metal􀃽oxide·semiconductor (MOS) capacitor. A semi-classical numerical model is presented to investigate the effect of non-uniform ...
  • Ahmed, Remon; Ahmed - Al- Nahid; Islam, Md. Jahurul (East West University, 2010-08-27)
    In this thesis we have represented the performance analysis of different types of nano-transistors such as single gate bulk MOSFET, double gate MOSFET, nanowire FET and CNTFET. Our observation is based on the ballistic ...
  • Monowar, Md. Mustafa; Palash, Md. Ibrahim; Halder, Upal Kumar (East West University, 2010-03-03)
    Inverter is a device that convert electrical energy from ac D circuit. Its typical application is to convert a battery voltage in a form using electronic conventional household AC voltage allowing you to use electronica ...
  • Arefin, Md. Toufique; Al- Imran, Md.; Bari, Md. Toufiqul (East West University, 8/12/2010)
    A graded bandgap p-i-n junction solar cell is proposed. The main purpose of graded bandgap is to ensure more efficient absorption of photons. The efficiency will increase according to the load current. Here we use ...
  • Sakib, MD. Nazmus; Jahan, Akther; Karim, Fazlul (East West University, 2010-05-23)
    After more than 30 years of validation of Moore's law, the CMOS technology has already entered the nonoscale (sub-lOOnm) regime and faced strong limitations. The nanowire transistor is one of the candidates which have the ...
  • Dastagir, Chowdhury Whalid Bin (East West University, 8/18/2010)
    In the telecommunication sector, monitoring the BTS's and BSC's is an important issue. In ROBI (AKTEL) AXIATA INTERNATIONAL LTD the importance of monitoring is enormous. Working in power monitoring slot provides hands-on ...
  • Siddique, Md. Sabit Hasan; Hasan, Md. Nahid (East West University, 2010-10-07)
    The Dhaka Electric Supply Company (DESCO) is one of the best electrical distribution company amongst its kinds. We started of our internship in DECSO 21, January 2010. Before starting in DESCO, an internship schedule and ...
  • Alam, Iftekharul (East West University, 2010-12-24)
    I have completed my internship Eminence Communication which is at Nikunjo-2, Khilkhet, Dhaka-1229. I have done all of my internship tasks different BTS such as Dhaka Norshingdi, Sylhet, Jessore and Shatkhira. main purpose ...
  • Ahsan, Md. Rifat; Raquib, Mahmudur; Isalm, S.M. Tanjilul (East West University, 2010-08-23)
    The power sector in Bangladesh faced numerous problems characterized by lack of supply capacity, frequent power cuts, unacceptable quality of supply, and poor financial and operational performance of the sector entities. ...
  • Jony, Md. Imran; Islam, Md. Saiful; Islam, Fabria Binte (East West University, 2010-12-21)
    Electricity is the basic infrastructure of today's modem development. But unfortunately this is the most painful suffering and crisis of Bangladesh. We are having huge shortage. This shortage will continue for years ...
  • Islam, Saniul; Ahmed, Imran (East West University, 2010-10-07)
    Electricity is a fundamental requirement to upgrade the socio economics condition and to alleviate poverty Proper enough electricity supply have a graet positive impact on our national economy as well as on GDP the country ...
  • Abu-Al-Sirazi; Hossain-Al-Mamun; Islam, Mohammad Riadhul (East West University, 2010-02-01)
    This report is to introduce fundamental of battery manufacturing. This report actually focuses on different machines, which are being used battery manufacturing industry. The operations of these machines are illustrated ...
  • Sina, Ahmad Muhammad (East West University, 2010-05-26)
    Mango Teleservices Limited is the only private sector IIG in Bangladesh. This report is based on my internship work in Mango Teleservices Limited. This report is to introduce ISO 9000 Quality Management System and the ...
  • Md. Moin-UI-Hasan (East West University, 2010-08-10)
    This report is to introduce the fundamentaJ of power solutions and maintenances of a data center. This report actually focuses on different machines, which are being used on Data Center Solution & Service especially on ...
  • Ahmed, Salah Uddin; Sarker, Tanmoy (East West University, 2010-10-07)
    This report is written on the basic of substation that is divided into two parts. One is transformer and another one is switchgear. In this report we focus on various machines which are used for transformer making and ...
  • Dhar, Goutam Chandra Sutra; Hossain, Md. Mosharof; Faruque, Md. Raihan (East West University, 2010-12-24)
    The completed our internship in Energypac engineering Ltd. The factory is at Savar, Baruipara. We did our internship related task in this factory. Energypac manufactures substation equipment's, primarily transformers and ...
  • Haque, Tandra; Saha, Sukhen (East West University, 2010-12-24)
    The 'internship report is the outcome of the 2-week attachment leaning with Energypac from 21 August to 04 September 2010- The intensive attachment gave us a practical exposure to look at the procedures of the different ...